TLS00 » Historique » Version 171
Matthieu Herrb, 07/09/2022 18:40
relevé 20220907
1 | 4 | Laurent GUERBY | {{>toc}} |
---|---|---|---|
2 | 1 | Laurent GUERBY | |
3 | 1 | Laurent GUERBY | h1. TLS00 |
4 | 1 | Laurent GUERBY | |
5 | 1 | Laurent GUERBY | tetaneutral.net dispose d'une salle associative à l'intérieur du datacenter TLS00 : http://www.tls00.fr/ |
6 | 1 | Laurent GUERBY | |
7 | 129 | Laurent GUERBY | 131 C Chemin du Sang de Serp - 31200 TOULOUSE GPS 43.62036, 1.42140 tourner a gauche GPS 43.62105, 1.42252 |
8 | 129 | Laurent GUERBY | |
9 | 68 | Laurent GUERBY | Photos : |
10 | 68 | Laurent GUERBY | * salle tetaneutral.net http://pano.tetaneutral.net/data/tls00/20140331/ |
11 | 68 | Laurent GUERBY | * onduleur dell http://pano.tetaneutral.net/data/tls00/20140401/ |
12 | 84 | Laurent GUERBY | * MMR-B-01 : |
13 | 84 | Laurent GUERBY | ** http://pano.tetaneutral.net/data/tls00/20140518/ |
14 | 84 | Laurent GUERBY | ** http://pano.tetaneutral.net/data/tls00/20140611/ |
15 | 3 | Laurent GUERBY | |
16 | 7 | Laurent GUERBY | dimensions : 400cm largeur x 552cm profondeur x 350cm hauteur : 22.08 m2 de surface et 77.28 m3 de volume |
17 | 7 | Laurent GUERBY | |
18 | 148 | Laurent GUERBY | h2. Cables |
19 | 148 | Laurent GUERBY | |
20 | 148 | Laurent GUERBY | |
21 | 148 | Laurent GUERBY | * MMR-B-01 : (le plus haut) 12FO vers Myrys 1-6 cable vers boitier TLS00 salle edition |
22 | 148 | Laurent GUERBY | ** 1 Myrys 1 porte <=> 8H |
23 | 148 | Laurent GUERBY | ** 2 Myrys 1 mur <=> 8B |
24 | 148 | Laurent GUERBY | ** 3 Myrys 2 porte <=> 4H TODO migrate to 9H |
25 | 148 | Laurent GUERBY | ** 4 Myrys 2 mur <=> 9B |
26 | 148 | Laurent GUERBY | ** 5 Myrys 3 porte <=> 10H |
27 | 148 | Laurent GUERBY | ** 6 Myrys 3 mur <=> 10B |
28 | 148 | Laurent GUERBY | ** 7 a 12 : cave de myrys |
29 | 148 | Laurent GUERBY | |
30 | 148 | Laurent GUERBY | * MMR-B-01 : 36FO juste en dessous du 144 vers salle asso http://pano.tetaneutral.net/data/tls00/20140518/IMG_20140518_221934.jpg |
31 | 148 | Laurent GUERBY | ** 1H Cogent 10G-LR transit |
32 | 148 | Laurent GUERBY | ** 1B Cogent 10G-LR transit |
33 | 148 | Laurent GUERBY | ** 2H unused |
34 | 148 | Laurent GUERBY | ** 2B ATTENTION ne marche pas |
35 | 169 | Laurent GUERBY | ** 3H Fullsave FTTH (2.sw.a2.3.tls00:Eth1/45) was Radisson 1G-LX was Cogent vers s2 SFP M000335 |
36 | 168 | Laurent GUERBY | ** 3B Fullsave FTTH was Radisson 1G-LX |
37 | 159 | Matthieu Herrb | ** 4H unused was Myrys 3 vers s7 port 24 TODO migrate to 9H |
38 | 148 | Laurent GUERBY | ** 4B unused |
39 | 160 | Laurent GUERBY | ** 5H Fullsave cartoucherie 4v |
40 | 160 | Laurent GUERBY | ** 5B Fullsave cartoucherie 4v |
41 | 148 | Laurent GUERBY | ** 6H Cogent 10G transit deuxieme port |
42 | 148 | Laurent GUERBY | ** 6B Cogent 10G transit deuxieme port |
43 | 148 | Laurent GUERBY | ** 7H unused |
44 | 148 | Laurent GUERBY | ** 7B unused |
45 | 161 | Matthieu Herrb | ** 8H Picto 1 was unused was Myrys 1 |
46 | 161 | Matthieu Herrb | ** 8B Picto 2 was unused Myrys 2 |
47 | 161 | Matthieu Herrb | ** 9H FranceIX 1 was unused TODO Myrys 3 |
48 | 161 | Matthieu Herrb | ** 9B FranceIX 2 was unused Myrys 4 |
49 | 162 | Laurent GUERBY | ** 10H Myrys 5 vers convertisseur de media 20211229 |
50 | 162 | Laurent GUERBY | ** 10B unused was: Myrys 6 vers s53 port sfp+1 |
51 | 159 | Matthieu Herrb | ** 11H Fullsave Transit 10G |
52 | 159 | Matthieu Herrb | ** 11B Fullsave Transit 10G |
53 | 159 | Matthieu Herrb | ** 12H unused was Prosoluce |
54 | 159 | Matthieu Herrb | ** 12B unused Prosoluce |
55 | 148 | Laurent GUERBY | ** 13H Ughy |
56 | 159 | Matthieu Herrb | ** 13B unused was Fullsave wifi |
57 | 148 | Laurent GUERBY | ** 14H Fullsave Transit |
58 | 159 | Matthieu Herrb | ** 14B unused was Fullsave CELAN 2417 |
59 | 148 | Laurent GUERBY | ** 15H TouIX vers port 9 MMR B puis port 21 S1-E03 |
60 | 148 | Laurent GUERBY | ** 15B TouIX vers port 10 MMR B puis port 22 S1-E03 |
61 | 160 | Laurent GUERBY | ** 16H s56 was S3-B11 13 jolibrain |
62 | 159 | Matthieu Herrb | ** 16B unused was S3-B11 14 |
63 | 159 | Matthieu Herrb | ** 17H unused was S3-B11 15 |
64 | 159 | Matthieu Herrb | ** 17B unused was S3-B11 16 |
65 | 148 | Laurent GUERBY | ** 18H unused |
66 | 148 | Laurent GUERBY | ** 18B TOUIX FranceIX BiDi (TX1310/RX1550 40km) VLAN 4031 et 4032 (franceix) |
67 | 148 | Laurent GUERBY | |
68 | 166 | Aymeric APLU | Serial s52 branché sur g1 |
69 | 167 | Aymeric APLU | Serial nexus (n3064e) branché sur g23. |
70 | 166 | Aymeric APLU | |
71 | 148 | Laurent GUERBY | h2. Jolibrain |
72 | 148 | Laurent GUERBY | |
73 | 148 | Laurent GUERBY | Baie S3-B11 |
74 | 148 | Laurent GUERBY | Livraison 20180226 |
75 | 149 | Laurent GUERBY | Acces (ticket + carte identité +empreinte veineuse) : beniz,guerby,mherrb,sileht,eZag |
76 | 148 | Laurent GUERBY | |
77 | 148 | Laurent GUERBY | Baie Modele: APC Netshelter SX - AR3107 |
78 | 148 | Laurent GUERBY | http://www.apc.com/shop/th/en/products/NetShelter-SX-48U-600mm-Wide-x-1070mm-Deep-Enclosure-with-Sides-Black/P-AR3107 |
79 | 148 | Laurent GUERBY | |
80 | 157 | Laurent GUERBY | Deux PDU : AP8953 (6kVA chacun 21 prises C13 3 prises C19) |
81 | 148 | Laurent GUERBY | http://www.apc.com/shop/et/en/products/Rack-PDU-2G-Switched-ZeroU-32A-230V-21-C13-3-C19/P-AP8953 |
82 | 148 | Laurent GUERBY | http://www.apc.com/salestools/MLAN-9F8QVU/MLAN-9F8QVU_R5_EN.pdf |
83 | 1 | Laurent GUERBY | |
84 | 149 | Laurent GUERBY | FSE-PDU-00140 PDU droite (depuis le couloir) |
85 | 149 | Laurent GUERBY | FSE-PDU-00141 PDU gauche |
86 | 149 | Laurent GUERBY | |
87 | 148 | Laurent GUERBY | Commandé par jolibrain mais pas arrivé un plateau fixe : |
88 | 1 | Laurent GUERBY | http://www.apc.com/shop/th/en/products/Fixed-Shelf-250lbs-114kg-Black/P-AR8122BLK |
89 | 1 | Laurent GUERBY | Fixed Shelf 250lbs/114kg Black |
90 | 1 | Laurent GUERBY | |
91 | 151 | Laurent GUERBY | h3. Hosting Rack |
92 | 150 | Laurent GUERBY | |
93 | 150 | Laurent GUERBY | Si vous ếtes interessés par un hébergement rackable inscrivez-vous : |
94 | 150 | Laurent GUERBY | |
95 | 150 | Laurent GUERBY | # Nom prénom ou personne morale / nb de U / conso Watt / simple ou double alim / prix mensuel acceptable |
96 | 150 | Laurent GUERBY | |
97 | 153 | Bertrand Cebador | # Cebador Bertrand 2backup / 2U / ~100 / ? / ~100e |
98 | 153 | Bertrand Cebador | |
99 | 149 | Laurent GUERBY | h2. Boitier |
100 | 149 | Laurent GUERBY | |
101 | 149 | Laurent GUERBY | Projet de boitier 4U DIY. Objectifs : |
102 | 149 | Laurent GUERBY | * pour jolibrain 4 GPU et bonne ventilation en 4U (eventuellement 8 si 2 cartes meres) |
103 | 149 | Laurent GUERBY | * pour tetaneutral.net boitier machine cluster 6-8 disques en remplacement des tours actuelles (et routeur PCIe 10G et plus) |
104 | 149 | Laurent GUERBY | * pour DCPBay boitiers N disque durs |
105 | 149 | Laurent GUERBY | |
106 | 149 | Laurent GUERBY | Fournisseurs potentiels ci-après, reste à trouver des motivés pour faire le design CAD. |
107 | 149 | Laurent GUERBY | |
108 | 149 | Laurent GUERBY | Bénévoles : |
109 | 149 | Laurent GUERBY | # Laurent GUERBY (pas de compétence CAD) |
110 | 152 | Nicolas Gonzalez | # Nicolas GONZALEZ |
111 | 149 | Laurent GUERBY | # nom prénom |
112 | 149 | Laurent GUERBY | |
113 | 149 | Laurent GUERBY | h3. Fournisseur |
114 | 149 | Laurent GUERBY | |
115 | 149 | Laurent GUERBY | Via Jean de Trebons (qui se propose de demander un devis) : |
116 | 149 | Laurent GUERBY | |
117 | 149 | Laurent GUERBY | http://mecalaser.fr |
118 | 149 | Laurent GUERBY | |
119 | 149 | Laurent GUERBY | Via gremi : |
120 | 149 | Laurent GUERBY | |
121 | 149 | Laurent GUERBY | http://sotip.com/fr/photos-produits.html |
122 | 149 | Laurent GUERBY | |
123 | 149 | Laurent GUERBY | h3. CAD Boitier |
124 | 149 | Laurent GUERBY | |
125 | 149 | Laurent GUERBY | Chercher des bases en open hardware. |
126 | 149 | Laurent GUERBY | |
127 | 149 | Laurent GUERBY | h4. Backblaze |
128 | 149 | Laurent GUERBY | |
129 | 149 | Laurent GUERBY | https://www.backblaze.com/blog/open-source-data-storage-server/ |
130 | 149 | Laurent GUERBY | Chassis – We’ve provided all the drawings you should need to build (or to have built) your own chassis. We’ve had multiple metal bending shops use these files to make a Storage Pod chassis. You get to pick the color. |
131 | 149 | Laurent GUERBY | 2-D Blueprints – ZIP file: 4.6 MB |
132 | 149 | Laurent GUERBY | 3-D Solidworks files – ZIP file: 112.0 MB |
133 | 149 | Laurent GUERBY | STEP files – ZIP file: 26.6 MB |
134 | 149 | Laurent GUERBY | Drive Guide design files – ZIP file: 606 KB |
135 | 149 | Laurent GUERBY | |
136 | 149 | Laurent GUERBY | https://f001.backblazeb2.com/file/Backblaze_Blog/Storage-Pod-6/Storage+Pod+6.0+Parts+List.pdf |
137 | 149 | Laurent GUERBY | |
138 | 155 | Laurent GUERBY | h4. OpenCompute |
139 | 154 | Laurent GUERBY | |
140 | 154 | Laurent GUERBY | http://opencompute.org/wiki/Server/SpecsAndDesigns |
141 | 154 | Laurent GUERBY | https://en.wikipedia.org/wiki/Open_Compute_Project |
142 | 148 | Laurent GUERBY | |
143 | 92 | Laurent GUERBY | h2. Consommation |
144 | 92 | Laurent GUERBY | |
145 | 92 | Laurent GUERBY | <pre> |
146 | 102 | Laurent GUERBY | Date Heure releve moyenne note |
147 | 132 | Laurent GUERBY | 20140527 0.0 kWh |
148 | 132 | Laurent GUERBY | 20140704 10h21 110.2 kWh |
149 | 132 | Laurent GUERBY | 20140710 18h06 131.6 kWh 148.3 Watt |
150 | 132 | Laurent GUERBY | 20140717 23h33 156.1 kWh 169.7 Watt |
151 | 132 | Laurent GUERBY | 20140808 00h08 232.4 kWh 151.4 Watt h7+n7+s8+nuc1 |
152 | 132 | Laurent GUERBY | 20140819 14h56 277.1 kWh 160.2 Watt + 2 onduleurs |
153 | 132 | Laurent GUERBY | 20140917 16h07 397.1 kWh 172.2 Watt ajout g1/g2/g3/s9/s4810a le 20140916 a 17h |
154 | 132 | Laurent GUERBY | 20140918 23h18 412.4 kWh 490.6 Watt ajout microserver mherrb a 23h |
155 | 132 | Laurent GUERBY | 20141002 23h29 605.2 kWh 573.5 Watt n7 eteint, ajout NUC Jocelyn |
156 | 96 | Laurent GUERBY | 20141009 11h00 ajout n7+stri par sileht |
157 | 132 | Laurent GUERBY | 20141023 10h56 911.9 kWh 624.0 Watt |
158 | 132 | Laurent GUERBY | 20141023 12h02 912.7 kWh |
159 | 132 | Laurent GUERBY | 20141023 12h28 913.0 kWh 49s 10 impulsions 10 Wh = 734.7 Watt |
160 | 132 | Laurent GUERBY | 20141023 12h41 913.2 kWh 742.8 Watt 53s 10 impulsions 10 Wh = 679.2 Watt |
161 | 132 | Laurent GUERBY | 20141027 11h37 979.1 kWh 694.2 Watt |
162 | 132 | Laurent GUERBY | 20141113 19h18 1265.3 kWh |
163 | 132 | Laurent GUERBY | 20141114 14h37 1279.0 kWh |
164 | 132 | Laurent GUERBY | 20141118 13h25 1518.0 kWh 713.4 Watt ajout deux onduleurs Eaton Ellipe Eco 1200 a charger |
165 | 132 | Laurent GUERBY | 20141210 12h38 1728.1 kWh 364.8 Watt ??? 1928.1 |
166 | 132 | Laurent GUERBY | 20141212 13h42 1765.3 kWh 759.2 Watt ajout g4 |
167 | 132 | Laurent GUERBY | 20141215 14h39 1827.7 kWh 854.8 Watt |
168 | 132 | Laurent GUERBY | 20141218 16h06 1892.7 kWh 884.3 Watt |
169 | 132 | Laurent GUERBY | 20141229 11h33 2122.4 kWh 885.2 Watt ajout mpower1 |
170 | 132 | Laurent GUERBY | 20150122 11h46 2615.0 kWh 855.2 Watt |
171 | 132 | Laurent GUERBY | 20150129 17h30 2766.7 kWh 871.9 Watt ajout g5 |
172 | 132 | Laurent GUERBY | 20150213 13h38 3111.5 kWh 968.5 Watt ajout NAS dlc+fab + Zotac id2ndr |
173 | 132 | Laurent GUERBY | 20150223 10h00 3344.7 kWh 986.7 Watt 36s 10 impulsions 10 Wh = 1000 Watt |
174 | 132 | Laurent GUERBY | 20150323 16h55 4032.0 kWh 1015.2 Watt |
175 | 86 | Laurent GUERBY | 20150413 13h31 4550.4 kWh 1035.7 Watt 34s 10 impulsions |
176 | 86 | Laurent GUERBY | 20150420 09h35 4722.8 kWh 1051.2 Watt 30s 10 impulsions rallumage g6 |
177 | 1 | Laurent GUERBY | 20150512 16h55 5301.2 kWh 1080.1 Watt |
178 | 86 | Laurent GUERBY | 20150601 11h41 5823.9 kWh 1101.0 Watt ajout g8 |
179 | 100 | Laurent GUERBY | 20150612 16h08 6142.2 kWh 1089.1 Watt |
180 | 86 | Laurent GUERBY | 20150716 19h32 7099.6 kWh 1135.0 Watt |
181 | 83 | Laurent GUERBY | 20150824 17h36 8203.2 kWh 1152.0 Watt |
182 | 69 | Laurent GUERBY | 20150827 10h54 8279.6 kWh 1166.4 Watt |
183 | 1 | Laurent GUERBY | 20150925 15h55 9090.2 kWh 1156.3 Watt |
184 | 83 | Laurent GUERBY | 20150928 15h25 9173.3 kWh 1162.2 Watt ajout g9 et g10 |
185 | 83 | Laurent GUERBY | 20151023 17h26 9962.0 kWh |
186 | 83 | Laurent GUERBY | 20151027 22h35 10103.6 kWh |
187 | 83 | Laurent GUERBY | 20151104 19h34 10419.8 kWh 1397.4 Watt ajout g4 avec CG |
188 | 91 | Laurent GUERBY | 20151120 18h27 10964.9 kWh 1423.3 Watt ajout g11 et g12 |
189 | 83 | Laurent GUERBY | 20151123 17h55 11093.0 kWh 1791.6 Watt |
190 | 91 | Laurent GUERBY | 20151124 14h13 11129.8 kWh 1840.0 Watt |
191 | 83 | Laurent GUERBY | 20151221 15h18 12202.1 kWh |
192 | 141 | Laurent GUERBY | 20151228 11h07 12430.2 kWh 1392.5 Watt |
193 | 141 | Laurent GUERBY | 20151229 19h34 12476.0 kWh 1409.0 Watt |
194 | 136 | Laurent GUERBY | 20160108 16h08 12804.8 kWh 1390.3 Watt |
195 | 136 | Laurent GUERBY | 20160222 15h49 14339.7 kWh 1453.5 Watt |
196 | 143 | Laurent GUERBY | 20160311 15h01 14966.4 kWh 1539.8 Watt |
197 | 143 | Laurent GUERBY | 20160325 14h26 15485.5 kWh 1547.2 Watt |
198 | 1 | Laurent GUERBY | 20160413 14h01 16193.3 kWh 1553.9 Watt |
199 | 1 | Laurent GUERBY | 20160415 14h52 16269.3 kWh 1551.0 Watt |
200 | 83 | Laurent GUERBY | 20160719 16h46 20055.0 kWh 1641.7 Watt arret g4 |
201 | 83 | Laurent GUERBY | 20160726 18h18 20307.6 kWh 1490.0 Watt g6 deviens moussaka |
202 | 100 | Laurent GUERBY | 20160818 18h37 21182.1 kWh 1517.5 Watt |
203 | 100 | Laurent GUERBY | 20160908 12h44 21961.8 kWh 1565.2 Watt |
204 | 90 | Laurent GUERBY | 20161017 15h06 23440.1 kWh 1575.4 Watt |
205 | 90 | Laurent GUERBY | 20161018 13h15 23476.5 kWh 1643.3 Watt |
206 | 1 | Laurent GUERBY | 20161027 15h37 23862.8 kWh 1769.2 Watt |
207 | 1 | Laurent GUERBY | 20161028 18h14 23913.0 kWh 1883.7 Watt |
208 | 1 | Laurent GUERBY | 20161103 15h26 24184.8 kWh 1925.6 Watt |
209 | 143 | Laurent GUERBY | 20161108 15h35 24389.0 |
210 | 90 | Laurent GUERBY | 20161109 14h12 24426.9 KWh 1675.76 Watt |
211 | 118 | Laurent GUERBY | 20161110 16h09 24471.8 KWh 1730.25 Watt |
212 | 1 | Laurent GUERBY | 20161114 16h37 24644.9 KWh 1794.40 Watt |
213 | 1 | Laurent GUERBY | 20161128 13h11 25229.4 KWh 1757.54 Watt |
214 | 1 | Laurent GUERBY | 20161201 10h45 25347.5 KWh 1697.65 Watt |
215 | 147 | Laurent GUERBY | 20161207 09h18 25591.2 KWh 1709.58 Watt |
216 | 147 | Laurent GUERBY | 20161222 10h33 26230.2 KWh 1768.86 Watt |
217 | 147 | Laurent GUERBY | 20170110 17h58 27045.5 KWh 1759.32 Watt |
218 | 147 | Laurent GUERBY | 20170207 12h27 28174.6 KWh 1694.12 Watt |
219 | 90 | Laurent GUERBY | 20170210 19h25 28309.3 KWh 1705.78 Watt |
220 | 90 | Laurent GUERBY | 20170217 18h35 28595.7 KWh 1713.26 Watt |
221 | 69 | Laurent GUERBY | 20170224 17h53 28898.5 KWh 1809.92 Watt |
222 | 144 | Laurent GUERBY | 20170306 14h31 29321.3 KWh 1786.73 Watt |
223 | 144 | Laurent GUERBY | 20170307 18h26 29372.4 KWh 1830.45 Watt |
224 | 144 | Laurent GUERBY | 20170309 14h54 29454.9 KWh 1855.32 Watt |
225 | 145 | Laurent GUERBY | 20170315 13h18 29725.0 KWh 1896.77 Watt |
226 | 145 | Laurent GUERBY | 20170330 10h13 30303.8 KWh 1621.67 Watt |
227 | 1 | Laurent GUERBY | 20170410 08h46 30611.9 KWh 1173.49 Watt TODO deuxieme voie ? |
228 | 146 | Laurent GUERBY | 20170420 09h31 30897.6 KWh 1186.71 Watt TODO idem |
229 | 146 | Laurent GUERBY | 20170619 08h52 32563.1 KWh 1157.12 Watt TODO idem |
230 | 163 | Matthieu Herrb | 20211214 18h16 34712.7 kWh |
231 | 163 | Matthieu Herrb | 20220127 15h42 35591.1 kWh |
232 | 165 | diartenyx 8CAT | 20220527 14h24 37919.7 kWh |
233 | 170 | Matthieu Herrb | 20220713 18h07 38859.9 kWh |
234 | 171 | Matthieu Herrb | 20220907 18h30 39958.1 kWh |
235 | 146 | Laurent GUERBY | </pre> |
236 | 146 | Laurent GUERBY | |
237 | 146 | Laurent GUERBY | <pre> |
238 | 146 | Laurent GUERBY | (/ (* 1000 (- 24184.8 23913.0)) (+ (* 24 5) (- 24 18.25) 15.4)) |
239 | 1 | Laurent GUERBY | (* 10 (/ 3600 36.0))1000.0 |
240 | 1 | Laurent GUERBY | (* 10 (/ 3600 24.0))1500.0 |
241 | 1 | Laurent GUERBY | (* 10 (/ 3600 20.0))1800.0 |
242 | 146 | Laurent GUERBY | (* 10 (/ 3600 18.0))2000.0 |
243 | 147 | Laurent GUERBY | (* 10 (/ 3600 14.4))2500.0 |
244 | 147 | Laurent GUERBY | (* 10 (/ 3600 12.0))3000.0 |
245 | 147 | Laurent GUERBY | (* 10 (/ 3600 10.3))3500.0 |
246 | 144 | Laurent GUERBY | (* 10 (/ 3600 9.0))4000.0 |
247 | 63 | Laurent GUERBY | </pre> |
248 | 63 | Laurent GUERBY | |
249 | 148 | Laurent GUERBY | h2. Historique |
250 | 8 | Laurent GUERBY | |
251 | 76 | Laurent GUERBY | h3. Tableau |
252 | 76 | Laurent GUERBY | |
253 | 76 | Laurent GUERBY | Jeudi 22 mai 2014 a 18h a TLS00, durée prévue 2h : montage du tableau et finition des prises electriques murales |
254 | 76 | Laurent GUERBY | |
255 | 76 | Laurent GUERBY | # Mika |
256 | 76 | Laurent GUERBY | # Laurent |
257 | 78 | Laurent GUERBY | # Yannick |
258 | 78 | Laurent GUERBY | # PG |
259 | 78 | Laurent GUERBY | # Ughy |
260 | 78 | Laurent GUERBY | # Thierry |
261 | 79 | Laurent GUERBY | # Bertrand |
262 | 1 | Laurent GUERBY | |
263 | 79 | Laurent GUERBY | Les 5x2 prises 220 sont cablées ainsi que les deux tableaux salle associative et TGBT A (merci Ughy :). |
264 | 76 | Laurent GUERBY | |
265 | 80 | Laurent GUERBY | Reste a faire : |
266 | 80 | Laurent GUERBY | # percer et fixer les IRL 20mm au mur |
267 | 1 | Laurent GUERBY | # decouper proprement les caches du tableau |
268 | 80 | Laurent GUERBY | # acheter un disjo 16A et un 10A (eclairage) de plus (coupure 10kA a Rexel). |
269 | 80 | Laurent GUERBY | # trouver un presse cable double 25mm pour brancher la cablette (on a les simple 25mm) |
270 | 80 | Laurent GUERBY | # trucs (mika je me souviens plus du nom) pour fixer la terre sur les baies |
271 | 80 | Laurent GUERBY | |
272 | 80 | Laurent GUERBY | |
273 | 80 | Laurent GUERBY | |
274 | 80 | Laurent GUERBY | h3. Cable 5G16 |
275 | 48 | Laurent GUERBY | |
276 | 8 | Laurent GUERBY | Norme : marron-noir-gris pour les phases respectivement (L1,L2,L3), bleu pour le neutre et vert-jaune pour la terre. |
277 | 1 | Laurent GUERBY | https://fr.wikipedia.org/wiki/Courant_triphas%C3%A9 |
278 | 64 | Laurent GUERBY | |
279 | 65 | Laurent GUERBY | A faire : dépose du cable 4G16 et pose du cable 5G16 sur 50 mètres, prévoir environ 2 heures a 2 ou 3 personnes dont une personne qui peut grimper sur echelle et structures (pas Laurent Guerby :) |
280 | 64 | Laurent GUERBY | |
281 | 48 | Laurent GUERBY | Qui est disponible et quand ? |
282 | 10 | yannick deroche | |
283 | 48 | Laurent GUERBY | Présents le samedi : |
284 | 10 | yannick deroche | # Laurent GUERBY (mercredi 14 mai toute la journée, jeudi 15 jusqu'a 19h - apres c'est [[QJELT]] , vendredi 16 toute journée sauf un rdv, samedi, dimanche, lundi) |
285 | 48 | Laurent GUERBY | # Aymeric (samedi & dimanche toute la journée, du 19 au 23 à partir de 16h) - peut monter sur une echelle - me prevenir mini 12h avant si besoin de moi :) |
286 | 50 | Aymeric APLU | # Elie (samedi & dimanche) |
287 | 51 | Laurent GUERBY | # Xavier (samedi ou dimanche toute la journée - possibilité vendredi si je suis prévenu en avance), no problemo avec échelle et échafaudage |
288 | 53 | Xavier Gendre | # Clement Bruche (samedi) |
289 | 59 | Laurent GUERBY | |
290 | 60 | Laurent GUERBY | Proposés : |
291 | 61 | Laurent GUERBY | # Rémy Carbon, mercredi, jeudi, vendredi, samedi, toute la journée aussi. |
292 | 54 | Anonyme | # Kevin Gandriau (vendredi à partir de 18h, ou lundi aprèm, mardi aprèm, mercredi aprèm) |
293 | 55 | Kevin Gandriau | |
294 | 56 | Laurent GUERBY | Rendez-vous samedi 17 mai a 14h a TLS00, fin prévue 17h. |
295 | 56 | Laurent GUERBY | |
296 | 56 | Laurent GUERBY | Pour ceux qui le souhaitent miam 12h au restaurant okinawa aux pont jumeaux 156 Allée de Barcelone (10mn a pied), |
297 | 56 | Laurent GUERBY | # Laurent Guerby |
298 | 1 | Laurent GUERBY | # Xavier |
299 | 59 | Laurent GUERBY | |
300 | 59 | Laurent GUERBY | Pose ok 14h45 a 16h15 donc environ 1h30, le 4G16 est reenroulé dans la salle tetaneutral.net |
301 | 56 | Laurent GUERBY | |
302 | 148 | Laurent GUERBY | h3. Equipements |
303 | 1 | Laurent GUERBY | |
304 | 1 | Laurent GUERBY | * 7 baies pleine hauteur |
305 | 1 | Laurent GUERBY | * 1 demi baie |
306 | 66 | Laurent GUERBY | * prises : 2 1 0 0 0 2 2 plus 3 total 10 bandeau 9 prises rackable = 90 prises |
307 | 66 | Laurent GUERBY | * plateaux : 6 6 5 9 2 6 6 total 40 rackable extractible sans outil |
308 | 66 | Laurent GUERBY | * 1 bandeau 8 prises IEC alim IEC gros (vertical en baie) |
309 | 75 | Laurent GUERBY | * switch SG3424 neuf : "s8" a configurer |
310 | 73 | Julien Aubé | * 36FO recup Mixart entre la MMR-B-01 et la salle associative (soudé) |
311 | 66 | Laurent GUERBY | * Commande de 70m de 4G16 pour relier le tableau 3x32A a la salle asso via fullsave a Rexel => erreur |
312 | 66 | Laurent GUERBY | * Commande de 50m de 5G16 => ok |
313 | 1 | Laurent GUERBY | * Commande compteur electronique via fullsave a Rexel => ok |
314 | 1 | Laurent GUERBY | * Commande disjoncteurs 32A HPI a Rexel => ok |
315 | 75 | Laurent GUERBY | * Commande boitier fibre 36 SC a fullsave pour le 36FO => ok / soudé |
316 | 66 | Laurent GUERBY | * ThomasP peux donner des patch Cat5e 2x24 ports si besoin |
317 | 75 | Laurent GUERBY | * misc (TODO) |
318 | 1 | Laurent GUERBY | |
319 | 3 | Laurent GUERBY | * TODO dimensions / porte |
320 | 1 | Laurent GUERBY | |
321 | 67 | Laurent GUERBY | * largeur d'equipement 1U = 44cm PC, un PC 19 (largeur) x 41 (hauteur) x 49 (longueur) => typiquement 2 PC en position normale sur un plateau. |
322 | 67 | Laurent GUERBY | |
323 | 1 | Laurent GUERBY | * Onduleur |
324 | 1 | Laurent GUERBY | ** Proposition K805N de fullsave 4200 VA / W |
325 | 1 | Laurent GUERBY | *** http://pano.tetaneutral.net/data/tls00/20140401/ |
326 | 1 | Laurent GUERBY | *** ftp://ftp.dell.com/Manuals/all-products/esuprt_ser_stor_net/esuprt_rack_infrastructure/dell-online-rack-ups-3750r_User's%20Guide_en-us.pdf |
327 | 13 | Mik Siccardi | *** 66kg + (besoin tableau électrique séparé à voir sorti IEC a priori) |
328 | 3 | Laurent GUERBY | ** via FSF on a déja 2 Eaton Ellipse ECO 1200 USB 1200 VA 750W |
329 | 11 | Laurent GUERBY | ** Don de Paul gros onduleur manageable (salle Photo) Smart-UPS 2200 : 2200 VA 1980 W / supporte SNMP et ethernet, charge actuelle 25%, format tour 50kg |
330 | 3 | Laurent GUERBY | ** En neuf 1200VA 169.95 http://www.ldlc.com/fiche/PB00115604.html 179.89 http://www.materiel.net/onduleur/eaton-ellipse-eco-1200-usb-69606.html |
331 | 1 | Laurent GUERBY | |
332 | 74 | Julien Aubé | * -perfo acces elec + fibre- Fait |
333 | 3 | Laurent GUERBY | |
334 | 2 | Laurent GUERBY | * Support cable |
335 | 1 | Laurent GUERBY | |
336 | 6 | Laurent GUERBY | pour le chemin de câble, a la plateforme du batiment : |
337 | 12 | Mik Siccardi | 2 chemin faisant le tour de la salle (sur 3 mur), monté 1 sur l'autre a 40cm , 1 pour l'elec, 1 pour le réseaux, |
338 | 12 | Mik Siccardi | on met des prises plexo en dessous du chemin réseaux |
339 | 12 | Mik Siccardi | |
340 | 20 | Mik Siccardi | en 150mm de large 3 m de long 12 x 34,90€ HT ref 9539 |
341 | 19 | Mik Siccardi | 2 crapaud de suspension pour fixation au mur (descente et remonté du jus jusqu'au tableau) 2 x 2,05€ HT ref 9545 |
342 | 1 | Laurent GUERBY | Eclisse en sachet de 25 10,90€ HT + 14,90 € HT + 7,20€ HT) ref 9543 , 9544, 9551 |
343 | 20 | Mik Siccardi | équerre pour fixation au mur 24 x 6,20€ HT ref 64938 |
344 | 1 | Laurent GUERBY | double prise elec 6 x 13,90€ HT ref 43167 soit 12 prises |
345 | 1 | Laurent GUERBY | coffret tertiaire pragma 4 rangés 72 modules 149€ HT ref 46191 la porte 37€ HT ref 46192 option serrure. |
346 | 17 | Mik Siccardi | manque les fixations (vis et chevilles pour parpaing) |
347 | 1 | Laurent GUERBY | |
348 | 1 | Laurent GUERBY | * disjoncteurs |
349 | 1 | Laurent GUERBY | |
350 | 23 | Mik Siccardi | 3 disjoncteur magneto thermique differentiel32A |
351 | 23 | Mik Siccardi | http://www.legrand.fr/ecat_france/410858-disj-diff-dx-6000-vis.html |
352 | 1 | Laurent GUERBY | |
353 | 23 | Mik Siccardi | et 6 disj 16A legrand |
354 | 1 | Laurent GUERBY | |
355 | 9 | Laurent GUERBY | TODO Alternatives et suggestions ? |
356 | 9 | Laurent GUERBY | |
357 | 148 | Laurent GUERBY | h3. Questions |
358 | 21 | Laurent GUERBY | |
359 | 21 | Laurent GUERBY | Si vous avez une question sur le projet : |
360 | 21 | Laurent GUERBY | |
361 | 22 | Laurent GUERBY | # Quelle date pour l'installation de machine adhérent ? |
362 | 47 | Laurent GUERBY | ## probablement d'ici fin avril / début mai |
363 | 46 | Baptiste Jonglez | # Est-ce adapté aux tours ou faut-il avoir des machines rackables ? |
364 | 47 | Laurent GUERBY | ## Nous avons des plateaux donc nous acceptons des machines de tout format comme actuellement a Myrys |
365 | 22 | Laurent GUERBY | # Autre ? |
366 | 21 | Laurent GUERBY | |
367 | 148 | Laurent GUERBY | h3. Dates |
368 | 1 | Laurent GUERBY | |
369 | 87 | Laurent GUERBY | - 27 mars 2014 : passage en passif Myrys - MMR - Cogent |
370 | 87 | Laurent GUERBY | - 27 mai 2014 : allumage du switch s8 |
371 | 87 | Laurent GUERBY | - 31 mai 2014 : activation du transit cogent 10G sur h7 |
372 | 87 | Laurent GUERBY | - 3 juin 2014 : mise en production de h7 |
373 | 87 | Laurent GUERBY | - 3 juin 2014 : allumage du R310 n7 (ex neo Balma) |
374 | 87 | Laurent GUERBY | - ~ 20 juin intervention changement de tiroir electrique servitude |
375 | 87 | Laurent GUERBY | |
376 | 1 | Laurent GUERBY | Voir [[DCFullsave]] |